Building Your Big Dreams

One project at a time

—— GENERAL CONTRACTING — COACHELLA VALLEY, CA

Built to pass

inspection the first time.

We lead every project with permit and code compliance discipline from day one — because the biggest risk on a construction timeline usually isn't the swing of a hammer, it's the inspection nobody planned for.

CTA 2

01

General Contracting


Full-scope construction delivery for industrial and commercial projects, from shell to interior build-out.

02

Project Management


Budget, schedule, and subcontractor coordination held to a documented, itemized standard.

03

Permit & Code Compliance


Entitlement strategy and inspection readiness built into the schedule, not bolted on after delays.

04

Industrial Construction


High-specification builds — power infrastructure, specialty MEP, and code-driven envelope systems.

—— CURRENT WORK

Two projects, two disciplines.

One ground-up industrial facility, one architect-designed residential compound — both run against the same compliance-first standard.

PROJECT 01 / DHS–2027

One Dillon Road

ecb198

A 35,000 SF Ag-Tech / Light Industrial facility built around a high-density power and resiliency profile — engineered for tenants whose operations demand more than a standard industrial shell can offer.


FCS serves as general contractor across both project phases: structural shell and full interior systems build-out, including electrical, plumbing, and high-efficiency HVAC.


PEMB SHELL4,000A SERVICE SOLAR + BESS CLEANROOM SPACE

LOCATION⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ Desert Hot Springs, CA


SIZE ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ 35,000 SF


TYPE ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀Ag-Tech / Light Industrial


CLIENT ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ Alchemy Social Equity, SPC


SCOPE⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ GC — Shell + Interior


SHELL START ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ Q1 2027 (Scheduled)

PROJECT 02 / PS–2027

Desert Modern Compound

A single-family residential compound in Palm Springs, developed and built in-house — clean-lined desert modern architecture built on a prefabricated structural system for precision and speed without sacrificing detail.


FCS holds both the developer and general contractor role on this project, managing the full arc from land through delivery.


DESERT MODERN PREFAB STRUCTURAL SYSTEM GROUND-UP

LOCATION⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ Palm Springs, CA


TYPE⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀Single-Family Residential


SCOPE ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ Ground-Up Construction


GROUNDBREAK ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ Q4 2026 (Scheduled)

—— ABOUT THE FIRM

Compliance is the strategy, not the paperwork.

Our team brings together decades of combined experience in real estate development, licensed general contracting, and property management across Southern California.


We built this firm around a simple observation: most construction risk isn't about the swing of a hammer. It's permitting delays, failed inspections, and preventable rework. We lead with documentation and code discipline from the first site visit, so projects move predictably from groundbreaking to close-out.

25+

YEARS COMBINED EXPERIENCE

2%

HISTORICAL BID ACCURACY

2

ACTIVE GROUND-UP PROJECTS

Let’s talk about your next project.


Whether it's ground-up industrial or a fully custom residential build, we'd rather hear about the constraints early than the delays later.

PHONE ⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀(951) 257-8186


EMAIL ⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀[email protected]


OFFICE ⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀ ⠀ 47403 Iris Way
⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀ ⠀ ⠀ La Quinta, CA 92253


SERVICE AREA ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀ ⠀Coachella Valley & Southern CA